assumed load

英 [əˈsjuːmd ləʊd] 美 [əˈsuːmd loʊd]

假定负载;假设载荷

化学



双语例句

  1. Adequate ductility in elongation may be assumed if the prestressing tendons obtain the specified value of the elongation at maximum load given in EN10138.
    如果预应力筋达到EN10138中的最大荷载下的延伸率规定值,则可以假定其在延伸时有足够的塑性。
  2. A variable so related to another that for each value assumed by one there is a value determined for the other. To each increment of load they respond with a definite change of stress and deformation.
    应变量,函数一个与他量有关联的变量,这一量中的任何一值都能在他量中找到对应的固定值对荷载的每个增量,应力的变形都有确定的变化。
  3. In this paper, the force exerting on diesel engine crankshaft is simplified as transient force which is produced by gas expansion and inertial force which is produced by diesel's running, and both of them are assumed to be concentrated load.
    通过对柴油机曲柄(曲轴)连杆机构作运动和受力分析,将其受力简化为气体膨胀的瞬间作用力和柴油机运转的惯性力,且均假设为集中荷载。
  4. Stress distribution in each model was analyzed on the basis of assumed conditions of constraint and load application by finite element method.
    用三维有限元方法对其进行应力分析,根据设定的约束及受力条件,确定其应力分布状态。
  5. It is assumed that the effect on top of every piles are same when vertically axial load is acting on pile foundation in current design methods.
    在桩基础现行设计方法中,当桩基础受轴心竖向力作用时,假定各桩的桩顶作用效应相同。
  6. For the design of reinforced concrete girder-joist floor systems, the maximum mid-span bending moment of joists can usually be found from an assumed continuous beam on which conversed load is applied to take into account the torsional rigidity of girders.
    设计钢筋混凝土肋梁楼盖次梁时,为求得跨中最大弯矩,通常采用折算荷载后按连续梁计算,以考虑实际结构中主梁抗扭刚度的影响。
  7. The algorithm can also forecast the future winding temperature and the time of reaching the max, permitted the assumed future load current and oil temperature.
    在假定的未来负荷和油温的条件下,该算法还能预报未来时刻的绕组温升/时间特性和绕组达到最高允许温度的时间。
  8. It is assumed that the load in every region is independent each other and the forecasted load is distributed in normal, thus the forecasted result related to the load passing through each circuit breaker and its probabilistic distribution can be further obtained.
    基于各个区域的负荷相互独立、负荷预测结果呈正态分布的假设,得出流过各个开关的负荷及其概率分布的预测结果。
  9. In the tensile zone, the stiffened panel is assumed ideal elasticity and plasticity, namely, in the elastic zone, the relationship of stress-strain obey Linear elastic law, and then in the plastic zone, the tensile elements are assumed to keep carrying the yield load.
    在拉伸区内,认为加筋板材料为理想弹塑性,即弹性阶段内的应力&应变关系曲线服从虎克定律,达到塑性阶段后,加筋板的强度值保持为屈服应力。
  10. Based on continuous porous medium seepage model, it is assumed that if waterproofing board of complex lining is perfect, the secondary lining is leakproof, thus the formula of external water load on secondary lining with a grouting loop is deduced.
    以连续孔隙介质渗流模型为基础,假定复合衬砌中防水板施工完好二次衬砌是封闭阻水情况,推导出了有注浆堵水圈的隧道衬砌结构外水荷载计算公式。
  11. The material of the model was assumed to be continuous, homogeneous and isotropic linear elastic, and the deformation was assumed to be small after the load applied.
    将模型材料假设为连续、均质、各向同性的线弹性材料,其受力后变形为小变形。
  12. In each element, it is assumed that the profile of the dynamic load varies with some functional form, and various shape functions of the dynamic load can be constructed through interpolation or fitting.
    假定时间单元内的动态载荷以某种函数形式变化,以插值或者拟合来构造动态载荷的各类形函数。
  13. For the analysis of local buckling, only the near-surface sublaminate appears buckling behavior is assumed and the connection between sublaminate and basic laminate is ideally rigid clamped support. The local critical buckling load is obtained by Rayleigh-Ritz method, too.
    在局部屈曲分析中,假定只在靠近层合板表面的子板发生屈曲,且子板与基板的连接假设为理想刚性固支,应用Rayleith-Ritz法求得局部屈曲临界荷载。